Exclusion zone
An exclusion zone is a designated area on or around a construction site where access is restricted or prohibited to ensure safety and prevent accidents. These zones are critical for protecting workers, equipment, and the public from potential hazards associated with construction activities.
Exclusion zones are generally established as part of a site’s safety management plan to mitigate risks associated with construction activities, such as falling debris, heavy machinery operation, or hazardous materials. Only authorised personnel are allowed to enter exclusion zones. Exclusion zones are clearly marked with signs, barriers, or fencing to delineate the boundaries and inform workers and visitors of the restricted area.
Exclusion zones might be created:
- Where construction activities, such as digging, lifting, or demolition, are taking place.
- Surrounding heavy machinery to protect workers from moving parts and operational hazards.
- Around areas where hazardous materials are stored or used, to prevent exposure to harmful substances.
- Around high-voltage equipment to avoid electric shock risks.
The creation and management of exclusion zones is based on a thorough risk assessment, which identifies potential hazards and determines the necessary safety measures to protect individuals. Exclusion zones may be adjusted as the construction project progresses and as different phases of work introduce new hazards or remove existing ones.
Workers are trained on the importance of exclusion zones and the specific rules associated with them. Regular safety briefings help maintain awareness and compliance.
Establishing exclusion zones when using explosives in demolition, Construction Information Sheet No 45, published by the Health and Safety Executive (HSE) states in relation to an exclusion zone: ‘When designing for demolition using explosives you need to plan for the possible fly of projectiles. An exclusion zone should be established at a distance from and surrounding any structure which is being demolished using explosives. The zone needs to be designed and managed as part of the overall approach to the demolition. People outside the exclusion zone should be safe from the demolition work. Everyone, with the possible exception of the shotfirer, should be outside the exclusion zone at the time of the blast. If the shotfirer needs to remain within the zone, he or she should be in a safe position.’
An exclusion zone is built up from four areas:
Safety in the storage and handling of steel and other metal stock, second edition, published by the Health and Safety Executive (HSE) in August 2016, defines an exclusion zone as: ‘A clearly defined area around a vehicle being loaded or unloaded from which all pedestrians and unauthorised persons are excluded while (un)loading is taking place.’
[edit] Related articles on Designing Buildings
Featured articles and news
OpenUSD possibilities: Look before you leap
Being ready for the OpenUSD solutions set to transform architecture and design.
Global Asbestos Awareness Week 2025
Highlighting the continuing threat to trades persons.
Retrofit of Buildings, a CIOB Technical Publication
Now available in Arabic and Chinese aswell as English.
The context, schemes, standards, roles and relevance of the Building Safety Act.
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.